Certified payroll guide
How to fill out Form WH-347
A plain-English, line-by-line walkthrough of the Department of Labor's weekly certified payroll form (Rev. January 2025), for contractors and bookkeepers on federally funded construction jobs.
Updated October 27, 2026 · About 10 minutes to read

Before you start
The WH-347 is the weekly certified payroll for construction work covered by the Davis-Bacon and Related Acts: federally funded or federally assisted projects like highways, transit, schools, housing and water work. Every contractor and subcontractor on the job submits one for each week work is performed, and the owner or an authorized officer signs it.
Have these in front of you:
- The wage determination in your contract (its number, like IL20260009, and the rates for each trade).
- Hours for the week for each worker, by day, including any hours they worked on other jobs (you'll need those for overtime).
- Your payroll register for the week: gross pay, tax withholding, FICA and other deductions, and net pay.
- Fringe benefit details: what you pay into health, pension or other plans per hour, or what you pay in cash instead.
The official blank form is free from the Department of Labor at dol.gov. The current version says “Rev. January 2025” in the top right corner. Older versions are no longer accepted by many agencies.
The header: project and company
The top of page 1 identifies the job and your company. Fill it in the same way every week.
- Final payroll box: check it on the payroll for your final week of work on the project.
- Prime contractor or subcontractor: check the one that describes your company on this job.
- Project name and location: the project name as written in your contract, and its full address (or at least the county and state).
- Project or contract number: the number the agency or prime contractor uses.
- Certified payroll number: number your payrolls in order starting with 1 for your first week on the project. Don't skip numbers.
- Wage determination number: every wage determination number (and revision) that applies to this pay period.
- Week ending date: the last day of your payroll week.
- Business name and address: your company's legal name and address.
Columns 1 to 3: workers and trades
| Column | On the form | What to enter |
|---|---|---|
| 1A | Worker entry no. | A number for each worker: 1, 2, 3… A worker with two trades keeps the same number on both lines. |
| 1B–1D | Last name, first name, middle initial | The worker’s legal name. |
| 1E | Worker identifying no. | The last four digits of their Social Security number or an employee ID. Never the full Social Security number. |
| 2 | J or RA | J for a journeyworker, or RA for a registered apprentice plus their progression level (for example, RA, 2nd year). |
| 3 | Labor classification | The trade actually performed, exactly as it appears on the wage determination (for example "Electrician" or "Laborer"). If someone worked in two trades, give each trade its own line. |
Classification is the most common reason a payroll gets kicked back. Use the wage determination's wording, and pay at least that trade's rate for every hour worked in it. If you don't keep an accurate split of hours between two trades, the worker must be paid the higher rate for all hours. If no classification on the wage determination fits the work, contact the contracting agency before the job starts.
Columns 4 and 5: hours
Each worker gets two rows: ST (straight time) on top and OT (overtime) below. Across the top, write the first letter of each day of your work week with the date under it, then the hours worked on this project under each day. Column 5 is the total for the week, on each row.
- Hours over 40 in the work week are overtime on most federal contracts, at no less than time and a half.
- Count all of the worker's hours for your company when working out the 40, even hours on other jobs, but only list this project's hours on this form.
Columns 6 and 7: rates, fringe and gross pay
| Column | On the form | What to enter |
|---|---|---|
| 6A | Hourly wage rate paid | The hourly rate you actually paid: straight time on the top row, overtime on the bottom. Don’t include cash paid in lieu of fringe here. |
| 6B | Total fringe benefit credit | If you pay into bona fide benefit plans: total hours × the hourly plan credit listed for that worker on page 2. |
| 6C | Payment in lieu of fringe benefits | If you pay the fringe as cash on the paycheck: total hours × the hourly cash fringe. |
| 7A | Gross amount earned | Pay earned on this project: straight time + overtime + cash in lieu of fringe. |
| 7B | Gross amount earned for all work | Gross pay for everything the worker did for you that week. |
The fringe rule: the wage determination lists a base rate and a fringe rate for each trade. For every hour worked, you must pay at least the base rate in cash, plus the fringe amount either into bona fide plans, as extra cash, or a mix of both. Fringe is owed on overtime hours too, but not at time and a half. Cash paid above the base rate can count toward the fringe.
Example: an electrician's rate is $52.35 plus $29.10 fringe. A worker with 40 hours paid $52.35 an hour and $1,164.00 in cash fringe (40 × $29.10) has 7A gross of $3,258.00 ($2,094.00 + $1,164.00).
Columns 8 and 9: deductions and net pay
Deductions come from the worker's gross for all work (7B), not just this project. Use the actual deductions from their paycheck; don't split them across jobs.
- Tax withholdings: federal income tax withheld.
- FICA: Social Security plus Medicare.
- Other: state and local tax, union dues, insurance, retirement and similar. If “other” is a single deduction, describe it in the remarks on page 2; if it's several, attach an itemized list. Deductions not listed in 29 CFR 3.5 need prior approval from the Department of Labor.
- Total deductions, then column 9, net pay: the amount actually paid to the worker for all their work that week.
Page 2: the Statement of Compliance

Page 2 repeats the project name, number, payroll number and week, plus the name and title of the person signing. That person then reads and checks each statement, which together certify that:
- the payroll is correct and complete, and nobody was paid less than the wage determination requires;
- all required payroll records are complete and available on request;
- each worker's classification matches the work they actually performed;
- any apprentices are registered in an approved program. List the program, whether it's registered with the federal Office of Apprenticeship (OA) or a State Apprenticeship Agency (SAA), and the trade. With no apprentices, leave this box unchecked and write “N/A”;
- fringe benefits were paid in cash and/or to bona fide plans. If you claim plan credit, fill in the table with each plan's name, type, plan number, whether it's funded, and the hourly credit for each worker. If you paid the whole fringe in cash, check the box and skip the table. Unfunded plans need Department of Labor approval before you can take credit for them;
- everyone was paid in full, with no rebates or deductions other than those the rules allow.
Statements 1, 2, 3 and 6 must be checked on every payroll; 4 and 5 when they apply. Use Additional remarks to explain “other” deductions and anything unusual. Then sign, date, and add a phone number and email. Electronic signatures are fine, but a scanned or pasted image of a signature is not. Signing is a legal certification: false statements can lead to civil or criminal penalties and debarment from federal work.
Mistakes that get payrolls rejected
- A classification that doesn't match the wage determination, or blended rates for two trades.
- A rate below the wage determination, or a fringe that comes up short.
- Hours over 40 not paid as overtime, or overtime below time and a half.
- Gross for all work (7B) lower than gross for this project (7A).
- Deductions that don't add up, or “other” deductions with no explanation.
- Full Social Security numbers on the form.
- Apprentices without their program listed on page 2.
- Missing signature, statements 1, 2, 3 or 6 left unchecked, or payroll numbers out of order.
Signwage checks for every one of these before it lets you download the form.
Frequently asked questions
Do I have to use Form WH-347?
No. The form itself is optional, but the information on it is not. Contractors on Davis-Bacon covered jobs must submit a weekly certified payroll with the same information and a signed Statement of Compliance. Most agencies and prime contractors expect the WH-347, so it is the safest choice.
Can I put the full Social Security number on the form?
No. Use an identifying number for each worker instead, such as the last four digits of their Social Security number or an employee ID. Full Social Security numbers and home addresses should not go on the weekly payroll you submit.
How often do I submit a WH-347, and to whom?
Every week that work is performed on the contract. Payrolls go to the contracting agency, or to the owner, sponsor or applicant when the federal agency is not a party to the contract. Subcontractors usually send theirs through the prime contractor. Check your contract for the exact due date and method.
What if no work was done on the project this week?
Ask the agency or prime contractor what they want. Many expect either a "no work performed" payroll for that week or a written statement of non-performance, so the payroll numbers stay in sequence.
Who can sign the Statement of Compliance?
The contractor or subcontractor, or an authorized agent who paid or supervised the payment of the workers that week, and who knows the facts are true. Electronic signatures are accepted; a scanned image of a signature is not. Signing certifies that everything on the payroll is true, so read each statement before checking its box.
Do Illinois state prevailing wage jobs use the WH-347?
Generally no. The WH-347 is for federal Davis-Bacon and Related Acts work. Projects covered only by the Illinois Prevailing Wage Act are reported through the Illinois Department of Labor’s own certified payroll system. If a project has federal money, the federal rules and the WH-347 apply.
How long do I have to keep payroll records?
Keep basic payroll records for covered work for at least three years after all work on the prime contract is completed, and make them available to the agency or the Department of Labor on request.
This guide is general information, not legal advice. Your contract, the wage determination and the Department of Labor's instructions control. Source: U.S. Department of Labor, Form WH-347 (Rev. January 2025) and its instructions, and 29 CFR Parts 3 and 5.
